Project Details

Scope Design of a new pipe bridge to replace the existing pipe bridge on-site which had been found to be in a poor state of repair. The new design had to maintain the existing mechanical and electrical services currently served by the existing bridge and be able to be installed adjacent to the existing bridge to minimise disruption during isolation and change over of the various systems. The design covered all support steelwork and pipework including steam, domestic water, raw water, compressed air and Nitrogen.

Deliverables